From: route@monster.com
Sent: Thursday, April 07, 2016 11:55 AM
To: hg@apeironinc.com
Subject: Please review this candidate for: p6 Scheduler
This resume has been forwarded to
you at the request of Monster User xapeix03
|
|||||||
|
|||||||
|
|
|
||||||
|
||||||
281-980-5358
(Hm) 281-435-3116 (Cell)
trainp@aol.com Summary of Experience Industry
Professional with over 20 years of diversified experience in the Energy
Production field, including Instrument and Control, Electrical, Mechanical,
Planning and Scheduling, PC Innovation, Budget Control/Management,
Petrochemical, Deep-water Piping and New Construction background. Technical
experience includes: Mainframe and personal computer experience with
proficiency in Primavera P3, P3e, P3ec, P5, P6, Primavera SureTrak (20+
years), Microsoft Project (20+ years), Lotus, Quatro Pro, Report Smith, Crystal
Reports, and Commitment Cost Tracking system. Certified in Primavera 601-6.8. CDI Inc., Houston, Texas
3-31-2014 to 12-12-2014 Senior Project Scheduler: P6.8 · Proposal
Scheduler · Multiple
Schedules for Multiple Clients (Upstream, Midstream, Down-
stream Clients) Texas Gulf
Energy, La Porte, Texas
6-3-13 to 10-24-13 Project Scheduler:
Microsoft Project · Several Capital Projects Scheduled and Updated. · Help set up turnaround using P6 · Capitol project (one million to one million five) using
Microsoft Project, Major Project being replacement of two
Boilers and Associated Equipment · P6 Turnaround Scheduler · Contract completed Kelly Services,
Texas
3-19-13 to 4-15-13 Project Scheduler: P6 · Assisted in Turnaround Scheduling, Replacement Scheduler,
Short Term Contract · Short Term Contract Completed (Dow Chemical-2 to 4 million
dollar project) Rockwell
(Houston, Texas)
8-12 to 2-13 Sr. Scheduler: P6 · Schedule subsea instrumentation and blow out preventers
(over 90+ projects) · (10 million dollars per project) · Contract Position completed Yokogawa,
(Sugar Land,
Texas)
Scheduler: P6 Sr.
Scheduler
3-12
to 8-12 · Senior Project Scheduler · Scheduler for project in Saudi Arabia (Large Production
Facility, 200 million dollars) · Scheduled (Develop/Maintain schedule) for Floating Hull
Project in South Korea · Built in South Korea (largest platform in the world thus
far) · (Contract Position ended) Gulf Interstate
Engineering (Houston, Texas)
10-11 to 2-12 Sr. Scheduler:
P6 · Built and maintained from 10 million to 100 million
dollars. · Cost and Budget Preparation (Light experience) General
Electric SubSea (HCL Staffing) (Houston, Texas)
01-11 to 10-11 · Primavera Advisor: Lead Scheduler for Sub Sea
General Electric Worldwide. · Scheduled Subsea Well Heads and Blow Out Preventers (Coast
of Africa, 100 to 300 million dollar projects) Siemens,
(Houston, Texas) (Contract)
07-10 to 10-10 Sr. Scheduler: P6
& Microsoft Project Set up project
controls scheduling basis for new division of Project Management for
Siemens. · Schedule the gas and steam turbine generation division as
well as turbine driven pumps, (2 million to 50 million dollars). · 5 overseas projects that include 3 pipeline installations
(25 million to 150 million dollars) · (Contract ended 10-29-10) Universal
Pegasus, (Houston, Texas)
09-09 to 2-10 Sr. Scheduler:
P6 · Multiple pipeline projects for Regency Partners, LLC. (250
million dollars) · (3 Pipelines in Southern Louisiana,) Includes weekly
reports to client and employer (consisting of earned value and cost
statements). AMEC Paragon
(Houston, Texas)
03-07 to 07-09 Scheduler:P3 Develop, maintain,
update and PDF schedules. Maintain project development. Prepare bi-weekly
update for multidiscipline engineering and multiple clients. Projects
include: · BP - Pipe Line North America Program: projects have
included DNS Gulf South, South Shaver Road Pipeline Relocation, 18"
Producing Pipe Line Pig Receiver Valve Replacement, Black Lake System. · ALBA – Murphy Oil – Platform for compressors in existing
field · Kizomba Satellites Pre-FEED Phase 1 · MarkWest OK Pipeline FERC Filing · Certified in P6 2008; Converted to P6 in 2008 · Laid off due to lack of work Aker
Kvaerner Subsea (Houston, Texas)03-06 to 01-07 Planner/Scheduler:
P3e · Manufacturing and assembly of trees and tree tools. · *Scheduled well heads and risers for several projects. Think
Resources /TXU Energy (Longview, Texas) (Contract)09-05
to 03-06 Scheduler: · Responsible for scheduling outages on lignite units. SMSI
Inc. (Los Alamos, New Mexico)(Contract)
01-05 to 09-05 Scheduler; P3e · Responsible
for project controls on design engineering at Los Alamos National Laboratory.
Two
Roads Professional (Long Beach, California) (Contract)09-04
to 09-04 Outage Scheduler:
P3 · Call-back for Irwin Industries to
work up a schedule for Unit 2 · Navaho Power Plant in Page, Arizona. General
Electric (Houston, Texas)(Contract) 03-04 to 08-04 Scheduler; Microsoft
Project · Responsible for scheduling in New
Development Division. References:
Upon Request. Page
1 of 3 |
|
|
||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Languages: |
Languages |
Proficiency Level |
|
English |
Fluent |
|
|
|